Pengendalian Persediaan Bahan Baku menggunakan Metode Min-Max Stock pada Perusahaan Konveksi Gober Indo

Main Article Content

Abdus Salam
Mujiburrahman Mujiburrahman

Abstract

Inventory of raw materials is the company's current assets that are used for production activities on the company continuously. Convection companies need to control inventory because it influences the smooth production process. Lack of inventory can result in disruption of the production process. While excess inventory can cause waste because companies need to spend more capital on inventory costs. The purpose of this study is to find out whether CV. Gober Indo Group has properly controlled the inventory of raw materials. The raw material inventory control method used in this study is the min-max stock method. This method determines how many safety supplies, minimum inventory, maximum inventory, and order quantity. After doing research, CV. Gober Indo Group has excess inventory of raw materials. The amount of inventory controlled by using the min-max stock method produces results that are more efficient when compared to the amount of the company's final inventory.

Downloads

Download data is not yet available.

Article Details

How to Cite
Salam, A., & Mujiburrahman, M. (2018). Pengendalian Persediaan Bahan Baku menggunakan Metode Min-Max Stock pada Perusahaan Konveksi Gober Indo. Jurnal EMT KITA, 2(1), 47–54. https://doi.org/10.35870/emt.v2i1.69
Section
Articles

References

Djunaidi, M., Setiawan, E. and Andista, F.W., 2005. Penentuan jumlah produksi dengan aplikasi metode fuzzy–mamdani. Jurnal Ilmiah Teknik Industri, 4(2), pp.95-104.

Ginting, R.B., 2014. Analisis Fungsi Implikasi Max-Min dan Max-Prod Dalam Pengambilan Keputusan. Creative Information Technology Journal, 1(2), pp.128-138.

Iqbal, T., Aprizal, D. and Wali, M., 2017. Aplikasi Manajemen Persediaan Barang Berbasis Economic Order Quantity (EOQ). Jurnal JTIK (Jurnal Teknologi Informasi dan Komunikasi), 1(1), pp.48-60.

Ismunandar, R., Hendriadi, A.A. and Garno, G., 2018. Kajian Metode Economic Order Quantity dan Reorder Point pada Aplikasi Point Of Sale. Jurnal Informatika: Jurnal Pengembangan IT, 3(3), pp.316-323.

Kahfi, H., 2015. Pengendalian Persediaan Filter Oli, Filter Solar, Filter Solar Bawah, Filter Solar Atas, Filter Udara, Filter Udara Dalam, Dan Filter Udara Luar Menggunakan Metode Economic Order Quantity (Studi Kasus di PT Aneka Dharma Persada Yogyakarta). (Doctoral dissertation, UPN Veteran Yogyakarta).

Kinanthi, A.P., Herlina, D. and Mahardika, F.A., 2016. Analisis Pengendalian Persediaan Bahan Baku Menggunakan Metode Min-max (Studi Kasus PT. Djitoe Indonesia Tobacco). PERFORMA: Media Ilmiah Teknik Industri, 15(2).

Lukita, K.C., 2017. Pengendalian Persediaan Bahan Baku Cup 120 Ml Menggunakan Metode Eoq, Poq, dan Min-max pada Perum Jasa Tirta I Malang. Jurnal Ilmiah Mahasiswa FEB, 5(2).

Mail, A., Asri, M., Padhil, A. and Chairany, N.C., 2018. Pengendalian Persediaan Bahan Baku Menggunakan Metode Min-max Stock di PT. Panca USAha Palopo Plywood. Journal of Industrial Engineering Management, 3(1).

Marbun, M. and Sihotang, H.T., 2017. Perancangan Sistem Perencanaan Jumlah Produksi Roti Menggunakan Metode Fuzzy Mamdani. Jurnal Mantik Penusa, 20(1).

Mohammaditabar, D., Ghodsypour, S.H. and O'Brien, C., 2012. Inventory control system design by integrating inventory classification and policy selection. International Journal of Production Economics, 140(2), pp.655-659.

Mulyanti, D., 2011. Analisis pengendalian persediaan buah segar pada Hipermarket Giant Poins Labak Bulus. Skripsi. UIN Syarif Hidayatullah Jakarta: Fakultas Sains dan Teknologi.

Pramono, G.H., 2008. Akurasi metode IDW dan Kriging untuk interpolasi sebaran sedimen tersuspensi di Maros, Sulawesi Selatan.

Prima Fithri, M.T. and Berlian, Y., 2015. Pengelolaan Persediaan Barang Suku Cadang (Spare Parts) pada Gudang PT. Semen Padang. Jurnal Ilmiah Teknik Industri, p.1.

Sadriatwati, S.E., 2017. Analisis Perbandingan Metode EOQ dan Metode POQ Denganmetode Min-max dalam Pengendalian Persediaan Bahan Baku Pada PT Sidomuncul Pupuk NUSANTARA. Admisi dan Bisnis, 17(1), pp.11-22.

Vergianti, A., 2018. Perencanaan Kebutuhan Persediaan Bahan Baku pada Proses Body Repair Mobil dengan Menggunakan Metode Min-Max (Doctoral dissertation, Universitas Muhammadiyah Surakarta).

Most read articles by the same author(s)